Tuesday, December 18, 2012

Journey

Assalamualaikum and Hye people,

Being one of HBP's student is what I never thought in life. My first impression when I get an interview for interior design, I am so happy. But when I've become one of HBP student, my feelings off in this major. It's because, Im not confidence with my self. The competition was high and scary thought always playing my mind. Art and designing is not me at all, and I have to learned it every week. Now, when I think back, if I'm not suit in this field, why Allah put me here and being part of HBP if I can't do it ? The time keep passing by and the project is getting tougher. But all I get is an amazing experience and the first thought that keep making me down is vanished. The people around me that are supportive and understanding never failed to put a smile on my face. Laughter and memories is all I had with them. The lecturer always guide us in every project. Im glad being a part of this family and I hope I can become a succesful student and designer. InsyaAllah. :)

Student life is ,

Activities !


Site Visit Batu Ferringghi


The Ship



Group 4 members at Hard Rock Hotel, Batu Ferringhi





HBP's Orientation
 Dinner

Sketches


Le Sketch 





Project 10


















Project 9

Project 9 which the project we have to do everything ; Integrated ( Planning , Managing and Designing )


Site Analysis Information


Schematic Design (Design Concept)
‐ Conceptual Sketches & Bubble Diagram



Proposed Site Plan (with roof plan and landscape)
‐ Floor Plan
‐ Front Elevation, Rear Elevation, Side Elevations
‐ Perspective Drawings: 2 Exteriors and 2 Interiors
‐ 1 interior section drawing (showing lobby & exhibition space)



Material Selection and Building Services


Model : Information Centre






Project 8


Project 8 : (Re)Visited

Location at Batu Ferringhi.




Project 7


7A : Site Analysis of HBP Spaces


7B : Skyway?Pedestrian Bridge
Presentation Drawing : Plan, Front
Elevation, Rear Elevation and Side Elevations


7C: Skyway Structural Model



Pedestrian Bridge


Monday, December 17, 2012

Project 6


Project Developement

We have to create a mind mapping following our roles in project developement based on RIBA plan of work. 

Project 5


Blueprint 

Students are required to produce plan and elevations from front, right, left and rear drawings. The drawings should be coloured based on the sculpture model.


Project 4


Sculpture : Sailing Boat 

This is my hand made sculpture. Im using ice-cream stick for every part of this boat.

Project 3



3a : Man-made Structure
3b: Natural Structure
We have to choose any building and natural structure that only exist in HBP. 


3a: Man-made Structure
The Drum - Main office of HBP


3b: Natural Structure
Pokok Puding

Project 2


Our next project is to draw two view which is a nice view and unpleasant one. The pleasant view is where it has the aesthetic value of the building either interior or exterior, while the unpleasant has the defect value of the building.


Pleasant View : Aesthetic


Unpleasant View : Defect


Project 1


Myself and I :

 This is my first drawing. We have to sketch our own face and write about our personal background and what we are going to be for the next 5 years. 



Personal Logo:

This is my personal logo. I know its look so 'girly' thing, but yes Im a girl. -.-
It shows my personality from here. Where music is everywhere, music is part of our life and the wing shows that Im a free woman. T.L.C.J is actually this words This Life Called Journey. Yes, we all in our own journey, everyday, every second is our journey to live. That I take it as my tagline in life.